---
{"type":"item","title":"How Long Should it TakeHow Long Should it Take","listId":125620,"itemKey":4,"position":5,"visibleItemTotal":7,"canonicalUrl":"https://listium.com/@CraftedLiving/125620/what-every-homeowner-should-know-before-starting-an-exterior-painting-project/4/how-long-should-it-takehow-long-should-it-take","listUrl":"https://listium.com/@CraftedLiving/125620/what-every-homeowner-should-know-before-starting-an-exterior-painting-project","listTitle":"What Every Homeowner Should Know Before Starting an Exterior Painting Project","creator":{"id":"CraftedLiving","name":"Crafted Living","url":"https://listium.com/@CraftedLiving"},"stats":{"views":72,"likes":0,"followers":0},"category":"home & garden / home improvement & repair","publishedAt":"2025-05-10T03:59:37.853Z","updatedAt":"2025-05-10T03:59:37.853Z","fields":[{"id":0,"name":"Name","type":"PrimaryText"},{"id":1,"name":"Notes","type":"Text","format":"long"}]}
---

# How Long Should it TakeHow Long Should it Take

From [What Every Homeowner Should Know Before Starting an Exterior Painting Project](https://listium.com/@CraftedLiving/125620/what-every-homeowner-should-know-before-starting-an-exterior-painting-project)  
By [Crafted Living (@CraftedLiving)](https://listium.com/@CraftedLiving)

List stats: 72 views · 0 likes · 0 followers  
Published 10 May 2025 · Updated 10 May 2025

Category: home &amp; garden / home improvement &amp; repair

- Notes: It can be quite difficult to accurately estimate the amount of time it takes to complete painting the exterior of a home. Factors such as the number of painters, the size of the house, the weather, and the amount of work required to prepare the surface. On average, small to medium-sized homes (1-2 stories, 1500-2500 sq ft) could take between 4-7 days, while bigger homes (2-3 stories, 2500-4000+ sq ft) could take between 7-15 days.
