Timeline for Home Building Process

A week by week progression of what to expect in a build for architects

This page may include affiliate links
Timeline for Home Building Process
View:
Suggest Item
Use this list
Steps
Steps
Stages
Checklist
Notes
Weeks
Complete
  • How many square feet do we want/need?

    Prior to build
    Week 3 - 5
  • Should the master bedroom face east or west?

    Prior to build
    Week 3 - 5
  • Do we want all bedrooms on the second floor?

    Prior to build
    Week 3 - 5
  • Footings formed and foundation poured

    Foundation
    0 / 3
    Week 5 - 11
  • Floor area fitted with utilities

    Foundation
    0 / 2
    Week 5 - 11
  • Inspection 1

    Foundation
    Week 5 - 11
  • Shell/Skeleton completed (Floor system, walls and roof system)

    Framing Phase
    Week 5 - 11
  • Plywood or oriented strand board (OSB) sheating applied

    Framing Phase
  • Sheathing covered with cover/house wrap

    Framing Phase
  • Pipes and wires

    Rough Plumbing and Electrical
  • Water supply lines

    Rough Plumbing and Electrical
  • Shower units and Bathtubs

    Rough Plumbing and Electrical
  • Sewer lines and vents

    Rough Plumbing and Electrical
  • Duckwork for HVAC* system

    Rough Plumbing and Electrical
    Week 12 - 15
  • HVAC* vent pipes installed

    Rough Plumbing and Electrical
    Week 12 - 15
  • Electrician installs receptacles

    Rough Plumbing and Electrical
    0 / 3
    Week 12 - 15
  • Wiring for cable TV / music systems / telephones

    Rough Plumbing and Electrical
    Week 12 - 15
  • Inspection #2

    Rough Plumbing and Electrical
  • Insulation thermal performance/R-value test for heat transfer

    Install Insulation
    0 / 4
    Week 15 - 17
  • Kraft paper or foil-kraft paper attachment to vapor barrier

    Install Insulation
    Week 15 - 17
  • Drywall hung and taped

    Complete drywall / interior textures
    Week 15 - 17
  • Drywall texturing (if applicable) is completed

    Complete drywall / interior textures
    Week 15 - 17
  • Primer coat of paint applied after taping complete

    Complete drywall / interior textures
    Week 15 - 17
  • Installing exterior finishes

    Complete drywall / interior textures
    0 / 4
    Week 15 - 17
  • Install exterior driveways

    Finish Interior trim
  • Install exterior walkways

    Finish Interior trim
  • Install interior door

    Finish Interior trim
    Week 15 - 17
  • Install doors

    Finish Interior trim
    Week 15 - 17
  • Install baseboards

    Finish Interior trim
    Week 15 - 17
  • Install door castings

    Finish Interior trim
    Week 15 - 17
  • Install window sills

    Finish Interior trim
    Week 15 - 17
  • Install moldings

    Finish Interior trim
    Week 15 - 17
  • Install stair balusters

    Finish Interior trim
    Week 15 - 17
  • How many square feet do we want/need?

  • Should the master bedroom face east or west?

  • Do we want all bedrooms on the second floor?

  • Footings formed and foundation poured

  • Floor area fitted with utilities

  • Inspection 1

  • Shell/Skeleton completed (Floor system, walls and roof system)

  • Plywood or oriented strand board (OSB) sheating applied

  • Sheathing covered with cover/house wrap

  • Pipes and wires

  • Water supply lines

  • Shower units and Bathtubs

  • Sewer lines and vents

  • Duckwork for HVAC* system

  • HVAC* vent pipes installed

  • Electrician installs receptacles

  • Wiring for cable TV / music systems / telephones

  • Inspection #2

  • Insulation thermal performance/R-value test for heat transfer

  • Kraft paper or foil-kraft paper attachment to vapor barrier

  • Drywall hung and taped

  • Drywall texturing (if applicable) is completed

  • Primer coat of paint applied after taping complete

  • Installing exterior finishes

  • Install exterior driveways

  • Install exterior walkways

  • Install interior door

  • Install doors

  • Install baseboards

  • Install door castings

  • Install window sills