

In modern construction, up to 30% of rework stems from detailing errors or outdated drawings. Even the most advanced tools can’t fix this unless teams manage complexity smarter. Every beam, column, and connection still needs to be precisely modeled and coordinated. Modern tools help, but projects are bigger, designs more intricate, and deadlines tighter than ever.
Even with advanced software, detailers face their own set of hurdles. Keeping up with frequent design revisions, managing multiple models, and ensuring that every change is reflected across fabrication and erection plans can get overwhelming. Collaboration is still a challenge when architects, engineers, and contractors work from different locations or use different platforms.
Accuracy and speed are expected at the same time. Missing either can delay the project or lead to costly errors. Even with the best software, teams need smarter ways to manage complexity and maintain quality under pressure.